BENEFITS
益处
1. Provides a documented system which
controls the activity/ service/ product.
提供一个控制活动/
服务/ 产品的文件体系
2. Produces written procedures that define
authority , responsibility, interfaces.
编制书面程序,规定权力,责任和相互关系
3. Ensures activity/ service/ product meets
all specified requirements.
保证活动/服务/产品符合全部规定要求
4. Promotes reputation in the market place
through customer satisfaction.
通过使客户满意,
建立市场信誉
5. Provides a system which ensures that all
errors/ nonconformities/ complaints/ deficiencies are
immediately identified, controlled and dealt with through
feedback loops.
提供一个体系,保证所有错误/不符合项/投诉缺陷立即被诊断,并通过反馈环路加以控制和处理。
6. Promotes efficiency and cost
effectiveness.
提高效率和成本有效率
7. Motivates staff towards a pride in
carrying out jobs.
激励工作人员的工作自豪感
8. Promotes improved industrial relations
through inter- departmental co- operation.
通过部门间的协作,促进工业关系的改善
9. Controls all activity/ service/ product
performance data through feedback analysis.
控制所有活动/
服务/产品的更改
10. Provides activity /service/ product
performance data through feedback analysis.
通过反馈分析,提供/服务/产品的性能资料
11. Identifies and controls training needs.
确定和控制培训需要
12. Shows commitment to quality through
maintaining constant quality levels.
通过保持一定的质量水平,
显示对质量的承诺
13. Improves communications.
改进交流
14. Produces historical records to confirm
levels of quality/ system effectiveness and activity/ service/
product achievement.
通过记录确定质量水平/
体系的有效性和活动/服务/产品的业绩
15. Provides information for employee
induction.
为指导员工的工作提出供信息
AUDIT DEFINITIONS
审核的定义
A Systematic and independent examination to
determine whether quality activity and related results comply with
planned arrangements and whether these arrangements are
implemented effectively and suitable to achieve objectives
是一项系统和独立的考核,
以确定质量活动及其结果是否与计划安排相一致,
计划安排是否得到有效落实,
并适于达到既定的目标。
AUDITOR
审核员
AUDITOR`S
RESPONSIBILITIES:
审核员的责任
A. Be
able to address searching questions to all operating staff
能向所有操作人员提出探险索性的问题
- Display
presence
- 显示风度
- Verbal
ability
- 口才
- Quick thinking
- 敏捷的思维
B.
Stand their ground
立场坚定
Remain calm and polite
保持镇静和礼貌
C. When requested to do so, as part of audit task:
当审核任务有要求时:
- Make
suggestions for improvement
- 提出改进建义
EXECUTIVE'S
RESPONSIBILITY
主管的责任
THE ORGANISATION'S
QUALITY EXECUTIVE IS RESPONSIBLE FOR CONTROLLONG AND PLANNING THESE
ACTIVITIES:-
一个组织的质量主管负责控制和计划以下活动:-
1. The
frequency of Audits-
审核的周期。
2. Defining
requirements for each audit including auditor' s qualifications -
team composition.
规定每次审核的要求,包括审核员的资格
- 小组组长。
3. Notifying
auditors/ audits of dates and requirements.
通知审核员/
被审核方审核日期和要求。
4. Providing
all applicable
提供所有适用的;
- Documents -
specifications - procedure - forms - required during the audit.
审核中需要的文件-
标准
- 程序
- 表格。
5. Appointing
a lead auditor (Team leader).
任命一名主任审核员(组长)。
6. Determine
need for specialist input.
决定有无必要聘用专家。
7. Supplying
previous audit reports and copies of outstanding nonconformities.
提供以前的审核报告及尚未解决的不符合项报告的副本。
Some of these
activities may be delegated to the “lead auditor”.
以上责任可由“主任审核员”部分代理
AUIT TEAM LEADER
审核组长
DEFINITION:
- 定义:
- An auditor
appointed to mange a Quality Audit as the team leader.
被任命为组长管一次质量审核的审核员
Must have
management experience and capability
必须有管理经验和能力
Must be given
authority to make final decisions regarding conduct of the audit
对与审核有关的问题有权作最后决定
Make clear detailed
verbal and written report to the organization’s management
向组织的管理者作清楚详细的口头和书面报告
THE LEAD AUDITOR WILL TAKE
RESPONSIBILITY FOR THE AUDIT PLANNING AND FOLLOWING ACTIVITIES:-
主任审核员要负责进行审核计划和以下活动:
1. Assist with
choosing audit team and specialists.
帮助挑选审核组成员及专家。
2. Controlling, planning
and co- ordinate the team and
the audit,3. to
ensure time used effectively and all requirements are
covered.
控制,计划并协调小组活动和审核,确保审核时间得到有效利用,所有要求都得到满足。
4. Compile
or advise on content of checklist
编撰核查表或对其内容提出建议
5. Liaise
with audits to ensure audit intent - scope and time are
understood to enable them to plan ahead.
与被审核方联系,
确保他们清楚审核范围和时间,并能事先做好准备。
6. Review
existing system documentation to ensure it meets
specification requirements.
审查现有体系文件,确保它们符合标准要求
7. Decide
on category of any Non-conformity.
决定不符合项的分类。
8. Report
critical NCR to auditee immediately .
一旦发现严重不符合项,立即向被审核方通报。
9. Representing
the audit team with the auditee management
代表审核组与被审核方的管理者交涉
10. Report
any major obstacles to performing audit to the Quality
Executive immediately.
对审核中遇到的重大障碍向主管报告,
11. Preparing,
writing and submitting the audit report
准备、起草并提交审核报告
12. Liaise
with the “Quality Executive” to determine audit
effectiveness and future action required.
与“质量主管”联系,确定审核的有效性和下一步的行动。
AUDITORIS
ACTIVITIES
审核员的活动
THE AUDITOR
SHOULD:-
审核员应:
1. Remain
within the Audit scope. Do not attempt to change scope.
保持在审核范围内,不要试图改变审核范围。
2. Exercise
objective and impartiality.
努力保持客观和公正。
3. Collect
and analysis all observation to permit conclusions of system
effectiveness to be made.
收集并分析所有的客观证据以得出体系有效性的结论。
4. Be
alert for indications of objective evidence that may affect or
influence the audit.
密切注意会影响审核的客观证据。
5. Art
in an ethical manner at all times.
始终保持风度。
6. Offer
observations clearly and concisely to conclusion of conformance
of system.
以简洁明了的方式写出观察报告,以得出体系的符合性的结论。
7. Assist
the ``Lead auditor ''to decide if any nonconformities should be
raised.
帮助“主任审核员”决定应提出的不符合项。
8. Assist
lead auditor to compile audit report.
帮助主任审核员编写审核报告。
AUDITEE
RESPONSIBILITIES
被审核方的责任
1. Inform
employees of audit objectives/ scope.
向员工解释审核的目的
/ 范围。
2. Appoint
responsible staff to accompany each auditor.
指定陪同每个审核员的责任人。
3. Provide
resources to ensure effective audit.
提供必要的资源以保证审核高效进行。
4. Provide
unrestricted access to all facilities to allow for collection of
objective evidence.
使审核员能够不受限制的接触设施,收集客观证据。
5. Co-operate
with auditors to ensure objectives are achieved.
与审核员合作,确保达到审核目标。
6. Report
clearance of corrective actions to the auditing authority.
向审核管理部门报告纠正措施的落实。
AUDITING
审核
AUDITING IS A FACT FINDING
MISSION AND NOT A POLICING OPERATION
审核是一项寻找事实的工作,而不是对工作的管制
QUALITY CONTROL IS A POLICING
OPERATION
质量控制是对工作的管制
FREQUENCY
周期
The audit frequency depend upon
individual circumstances.
审核的周期视具体情况而定。
As a guide the following would
normally apply:
作为参考,以下是通常的做法:
1. Each system element at least
annually.
每个体系要素每年至少审核一次。
2. More frequently to clear
outstanding or previous nonconformities.
纠正重大的或以前的不符合项时应加大审核频次。
3. As
required to satisfy contract requirements.
按合同要求执行。
4. As
specified in the certification body` s plan
认证组织计划中规定。
AUDIT PROCEDURE
审核程序
There must be system procedure
to control all audits. The audit procedure shall include:
应制订系统程序(8.2.2)来控制所有审核,
审核程序应包括:
1. Statement of responsibility
- organizational independence and authority of auditors
责任的说明---组织独立性和审核员的权力
2. Stated authority of the
‘Executive’ responsible for managing audits and reporting
route
审核“主管”人员的权力和报告程序
3. Standard of training for
auditors and team leaders
审核员和小组组长的培训标准
4. Provision
for access to premises and levels of management who will carry
out corrective action
允许进入的区域和允许接触执行纠正措施各级人员的规定
5. Responsibility
for corrective actions.
执行纠正措施的责任
6. Use
of specialists
需要时聘用专家
7. Methods
for setting up - conducting of and following up all audits
策划组织进行和跟踪审核的方法
8. Rules
for deciding criticality of any NCR
判定不符合项严重性的规则
9. Format
and distribution of NCR` S and Audit reports
不符合项报告和审核报告的格式和分发
10. Requirements
for record keeping
记录保存的要求
11. Elevate
problem to management
向管理者揭示所发现的问题
12. The
audit procedure needs to be distributed to all those who will be
involved in audits.
审核程序需要分发给所有参加审核的人员
13. It
would be prudent to ensure that they fully understand their
involvement.
应保证这些人员都清楚他们的工作
THE AUDKT CYCLE
审核过程
THREE STAGES TO
AUDITING
审核的三个阶段
1. Pre-audit Management
审核前管理
a. Preparation and planning
准备和制订计划
b. Preliminary visit
初次访问
c. Detailed plan
详细计划
2. The Audit
审核
a. Opening meeting
见面会
b. The actual audit
现场审核
c. Report preparation
准备报告
d. Closing meeting
总结会
3. Subsequent Action
后续措施
a. Prepare/ submit report
编写/提交报告
b. Close out corrective actions
贯彻纠正措施
c. Plan surveillance/ review/
re-audit
制订监督/复审计划
d. Create and store records
汇总记录
PRE-AUDLTIVITY
审核前的活动
SCHEDULING
计划
Internal Audits
scheduled to ensure all applicable elements of Quality System
are covered.
对内部审核进行策划以确保它覆盖了质量体系的全部适用要素。
Review Audit
Schedule regularly to ensure it meets current system activities
and structure
定期检查审核计划以确保它符合现行体系活动和结构。
Initiate early in
life of activity to determine effectiveness and compliance with
Quality System requirements.
审核应从一项活动的早期开始以确定其有效性和与体系要求的符合程度。
These measures
indicate to an internal/ external auditor that the system is
being controlled.
这些措施向内部/外部审核员显示体系得到了控制。
1.确定审核组长﹑审核组成员
2.收集被审核方资料﹑进行文件
审核
3.编制审核计划
4.编制核查表
5.通知被审核方
CHECKLISTS
核查表
1. Main
aid used by auditors/assessors as an aide memories
审核员/ 评审员作为备忘录的一种主要工具。
2. Questionnaire covering all
relevant points of a procedure or specification or requirements
against which audits are carried out.
问题清单,包括所有有关程序或规范的要点或审核所对照的要求。
3. Ensures all elements/
requirements of a procedure or specification are covered
确保覆盖了程序或规范的所有要素/ 要求
4. Compiled from results of a
study of the procedure/ specification
根据对程序/ 规范的研究结果编写
5. Covers all relevant
requirements contained in the procedure/ specification by asking
a series of questions
通过题问方式覆盖了程序/规范的所有相关要求
6. Obtaining proof of
achievement
获得体系达到要求的证据
7. References each question to
the relevant specification clause
将每个问题与有关规范的条款对照
8. An aid to writing the audit
report
帮助编写审核报告
9. Allow space for written
observations against each question
留出空白,以便针对每个问题书写观察记录。
对照标
准和体系文件(手册﹑程序文件)要求
选择典型的质量问题
结合受审核部门的特点
抽样应有代表性
时间要留有余地
核查表要有操作性
CHEGKLISTS
核查表
Checklists are :-
核查表是:
1. Confirming -
knowledge based
确认-
了解
Procedure is in place
程序已具备
Procedure is in use
程序正在使用
2. Checking - Proof
based
检查-
证明
Take sample of activity
对活动进行抽查
Prove operation under
control
证明操作处于受空状态
Procedure is working
程序在运行
WRITTEN
ASSESSMENT REPORT
书面评审报告
THE AUDIT REPORT
DATA SHALL LIST AND CONTAIN THE FOLLOWING INFORMATIOM:
审核报告应列举和包含以下信息:
A. An introduction and
description of audit aim and task
介绍和描述审核的目标和任务
B. A short summary of audit
findings including total of nonconformities found.
审核中发现的问题,包括全部不符合项的简短总结。
C. Detailed description of
findings including NCR`s and agreements. This is listed
against the specification requirements. NCR`s are usually
attached.
所发现问题的详细描述,包括不符合项和商定的措施。这应根据标准化要求列举。通常附带不符合项报告。
D. Comments on previous NCR`
S cleared during this audit.
以前审核中的不符合项在这次审核中解决的情况说明。
E. Statements of agreed
corrective actions . These may be included in attached NCR`S.
商定的纠正措施的说明。
这可以包含在附带的不符合项报告中。
F. Agreed follow - up
actions
同意的跟踪措施。
G. Conclusions reached as a
reaches as a result of audit.
作为审核结果得出的结论。
H. Recommendation being made
(depends on contract).
推荐意见(依照合同)
I. Attendance sheet
参加者名单
RESPONSE TO
AUDIT REPORT
对审核报告的反应
THERE ARE 3 PHASES
OF RESPONSE TO THE AUDIT REPORT:-
对审核报告的反应分3个阶段:
PHASE 1 - Immediate response by
management
阶段
1 - 管理者的立即反应
1. Review and investigate report
findings.
复审并调查所发现的情况。
2. Schedule
appropriate corrective actions.
对适宜的纠正措施的落实制订计划。
3. Respond
in writing to audit team leader.
书面答复审核组组长。
PHASE 2- Subsequent response by
management
阶段2
-管理者的后续反应
1. Complete
corrective actions
落实纠正措施
2. Inform
auditor in writing and return completed nonconformity report
forms.
书面通知审核员并归还填好的不符合项报告
3. The
auditor reviews:
主任审核员审查:
management
response to the report and the nonconformities
管理者对报告和不符合项的反应
declared
completion of corrective actions.
完成纠正措施的声明。
4. Auditor
follows up effectiveness of corrective actions.
审核员跟踪检查纠正措施的有效性。
5. Once
satisfied auditor signs off NCR` S.
认可后审核员在不符合项报告上签字。
If management fail to respond to
the audit report then the auditor initiates Phase 3.
如果管理者未能就审核报告做出反应,审核员应着手展开第三阶段。
PHASE 3 -
阶段
3 -
1. Obtain
written response to audit report .
应得到对审核报告的书面反映。
2. Evaluate
adequacy of response.
考虑该反映是否充分和全面。
3. Confirm
corrective action is accomplished and is effective.
确认纠正措施已经落实且行之有效。
4. Follow
up action through :
通过以下方法进行跟踪
:
written
communication
书面通讯
re -
audit
复审
other
means
其它办法
AUDIT RECORDS
审核记录
THESE VARY
DEPENDING UPON ORGANISATILN BUT NORMALLY COMPRISE:
每个组织各不相同,但通常包括:
a. Audit
plans/program
审核计划/大纲
b. Audit
summary and final reports
审核总结和最终报告。
c. Checklists
核查表
d. Response
to report
对报告的反应
e. Nonconformity
reports
不符合项报告
f. Records
of successful clearance of agreed corrective actions
圆满完成商定纠正措施的记录
g. Any
relevant correspondence
任何相关的信函
h. Follow
- up reports
跟踪报告
i. List of
trained auditors and their qualifications
经培训的审核员名单及其考核记录
j. Methods
and retention periods for records
记录保管的方法和期限
|